This paper proposes a power-based network-constrained unit commitment (UC) model as an alternative to the traditional deterministic UCs to deal with wind generation uncertainty. The formulation draws a clear distinction between power-capacity and ramp-capability reserves to deal with wind production uncertainty. These power and ramp requirements can be obtained from wind forecast information. The model is formulated as a power-based UC, which schedules power-trajectories instead of the traditional energy-blocks and takes into account the inherent startup and shutdown power trajectories of thermal units. These characteristics allow a correct representation of unit’s ramp schedule which define their ramp availability for reserves. The proposed formulation significantly decreases operation costs compared to traditional deterministic and stochastic UC formulations while simultaneously lowering the computational burden. The operation cost comparison is made through 5-min economic dispatch simulation under hundreds of out-of-sample wind generation scenarios.
Palabras clave: Mixed-integer programming, operating reserves, power-based UC, power-capacity reserves, ramp-capability reserves, unit commitment.
Fecha de publicación: 2016-06-27.
Cita:
G. Morales-España, R. Baldick, J. García-González, A. Ramos, Power-Capacity and Ramp-Capability Reserves for Wind Integration in Power-based Unit Commitment, Technical Conference to Increase Real-Time and Day-Ahead Efficiency Through Software - FERC 2016, Washington (Estados Unidos de América). 27-29 junio 2016.